English News Details

img

Third coal power plant in Norochcholai fixed, operates in full capacity: Minister 01.Oct.2022

The third coal power plant in Norochcholai has been fixed and connected back to the national grid, Power and Energy Minister Kanchana Wijesekera said.

He said the power plant unit one and three are operating at full capacity. The unit one of the power plant was back to operation after it was shut down for maintenance, he said.

The power plant unit two is expected to be completed in mid October, the minister added.